
Al Maha Desert Resort and Spa
LOCATION

Dubai, United Arab Emirates
Project Facts
Project Al Maha Desert Resort and Spa
Client Emirates
Built-Up-Area N/a
Services Master planning, Architectural Concept, Preliminary and Detail Design, Structural Engineering, Commercial Kitchen Design, Interior Design, Authority Approvals and Building Permits, Project Tendering, Administration and Award, Site Supervision.
Collaborating Architect Schuster Pechtold and Partners
Status Complete, Phase 1: 2000, Phase 2: 2004
Budget US$100 Million
Project Features
PHASE 1
30 Deluxe Chalets with Swimming Pools, 2 Family Chalets with proportionally larger Swimming Pools, 1 Presidential Suite with full-length Swimming Pool, Guest Reception, Front Office, Souvenir Shop with Store, Male & Female Majlis’, Library/ Boardroom, Tea Salon, Prayer Room, Main Dining Restaurant, Pre-Dinner Bar, Gym, Communal Swimming Pool, Outdoor Pool Majlis, GM Ofice, Admin Offices, Commercial Kitchen, Staff Canteen, Cold and Dry Stores, Staff Quarters for 100 staff, Animal enclosures, Horse Stables and a Palm Oasis.
PHASE 2
10 additional Deluxe Chalets with larger Swimming Pools, 2 additional Family Chalets with proportionally larger Swimming Pools, 1 additional Presidential Suite with full-length Swimming Pool, enlargement of the private pools of all existing chalets and a Day Spa with 4 individual treatment rooms, 1 couples treatment room, Rasul Therapy, Wet-Treatment Room, indoor Jacuzzi, Gym, Juice Bar, Mani-Pedi Salon, Spa-Shop, Sauna, Steam Room and Ice Pool.
Turning Ordinary Into Extraordinary
We have 30 years of experience in designing award-winning architecture
Let's Talk
Phase 1

The common guest pool, pool bar a terrace is located at mid-level, central yet secluded by the introduction of a palm-tree oasis with a proper falaj system that originates at the central building and one of the guest paths that leads to the pool and oasis; a subtle education of historical irrigation and date farming traditions in the Gulf for guests.
The staff accommodation, being a relatively large, two-storey structure is position carefully in a naturally occurring dip in the desecrate close to the Resort. Traditionally, hotel staff in the Gulf are housed in remote locations away from the resorts. Here, we proposed utilising the dip to accommodate the required accommodation, which would keep it out of view (except the roof that would be visible on approaching the guest facilities). Thus, the staff would be walking distance to the resort (supporting the eco-mission of the development) and the roof could be used for the solar panels integrated into the project for the hot-water requirements, thereby demonstrating to approaching guests the Resort’s concerted and avant-garde efforts to be true eco-resort in every way possible.
Phase 2
Due to the overwhelming success of the resort, five years after its completion, the client decided to expand the resort by adding 10 standard chalets, 2 ‘Royal’ chalet and 2 ‘Presidential’ chalets, a day spa as well as additional support facilities including a second staff accommodation block, horse stables and a camel enclosure. Continuing with the same design philosophy as established at the outset, the masterplan is extended to conserve the desertscape as best possible. However, the challenge here was that this time, the resort would remain fully operational during construction. This is achieved by appending the new guest chalets close to the ends of the existing ‘branches’.
The common pool bar and pool terrace developed in to the Day Spa with the addition of new structure to the rear of the existing building and connected through at completion.
The second staff accommodation is located close to the original for operational ease and walking distance to the guest facilities yet hidden out of sight behind the and large sand dunes and extensive vegetation that has flourished since the opening of the resort.


Location
Colonella, Italy
PROJECT FACTS
Project Bella Oceana Residential Community
Client OPM
Built-Up-Area N/a
Services Masterplanning, Architectural Concept, Preliminary Design, Design and Project Management Pre and Post Contract
Status Under Construction
Budget N/a
PROJECT FEATURES
PHASE 1: Lago Vista
Five (5), three-storey ‘Lago Vista’ residential buildings. Each will have:
• 13 Apartments/ Floor (39 Apartments/ Building)
• 13 Private Pools
• 2 lifts
• 39 Resident Car Park Spaces
• 5 Visitor Car Park Spaces
• Central MEP Services
• Central Garbage Services
PHASE 2: Casa Verde
35, two-storey ‘Casa Verde’ residential buildings. Each will have:
• 6 Apartments/ Floor (12 Apartments/ Building)
• 6 Private Pools
• 1 lift
• 12 Resident Car Park Spaces
• 2 Visitor Car Park Spaces
• Central MEP Services
• Central MEP Services
• Central Garbage Services
PHASE 3: Belvedere
Nine, two-storey ‘Belvedere’ residential buildings. Each will have:
• 2 Apartments/ Floor (4 Apartments/ Building)
• Private Pool Option
• 8 Resident Car Park Spaces
• 2 Visitor Car Park Spaces
• Central MEP Services
• Individual MEP Services
• Central Garbage Services
Turning Ordinary Into Extraordinary
We have 30 years of experience in designing award-winning architecture
Let's Talk